Extra Long Lead Rope
In stock
Only %1 left
SKU
440
As low as US$11.99
Free delivery when you spend over $75 or more.
A useful extra long lead rope with a brass swivel trigger clip. Length: 3m.
Hand Wash Only
100% Polyester
Products will typically be dispatched within 3 business days or the order date.
Any order over $75.00 USD will qualify for free shipping to the 48 Contiguous states, Hawaii, Alaska and Puerto Rico.
Delivery charges are based on zip code, and are calculated at check out. Typical transit times will be based on the below map.
Shipping costs
State | Price |
AL | 14.99 |
AK | 24.99 |
AZ | 19.99 |
AR | 14.99 |
CA | 19.99 |
CO | 17.50 |
CT | 9.99 |
DC | 12.50 |
DE | 12.50 |
FL | 14.99 |
GA | 14.99 |
HI | 24.99 |
ID | 19.99 |
IL | 14.99 |
IN | 12.50 |
IA | 14.99 |
IA | 14.99 |
KS | 14.99 |
KY | 12.50 |
LA | 14.99 |
ME | 9.99 |
MD | 12.50 |
MA | 9.99 |
MI | 12.50 |
MN | 14.99 |
MS | 14.99 |
MO | 14.99 |
MT | 17.50 |
NE | 17.50 |
NV | 19.99 |
NH | 9.99 |
NJ | 12.50 |
NM | 17.50 |
NY | 12.50 |
NC | 12.50 |
ND | 14.99 |
OH | 12.50 |
OK | 14.99 |
OR | 19.99 |
PA | 12.50 |
PR | 24.99 |
RI | 9.99 |
SC | 12.50 |
SD | 14.99 |
TN | 12.50 |
TX | 14.99 |
UT | 19.99 |
VT | 9.99 |
VA | 12.50 |
VI | 24.99 |
WA | 19.99 |
WV | 12.50 |
WI | 14.99 |
WY | 17.50 |